Search results

1 – 2 of 2
Article
Publication date: 28 December 2017

Jian-jun Yuan, Shuai Wang, Weiwei Wan, Yanxue Liang, Luo Yang and Yifan Liu

The aim of this paper is to implement direct teaching of industrial manipulators using current sensors. The traditional way to implement teaching is either to use a teaching…

Abstract

Purpose

The aim of this paper is to implement direct teaching of industrial manipulators using current sensors. The traditional way to implement teaching is either to use a teaching pedant, which is time consuming, or use force sensors, which increases system cost. To overcome these disadvantages, a novel method is explored in the paper by using current sensors installed at joints as torque observers.

Design/methodology/approach

The method uses current sensors installed at each joint of a manipulator as torque observers and estimates external forces from differences between joint-driven torque computed based on the values of current sensors and commanded values of motor-driven torque. The joint-driven torque is computed by cancelling out both pre-calibrated gravity and friction resistance (compensation). Also, to make the method robust, the paper presents a strategy to detect unexpected slowly drifts and zero external forces and stop the robot in those situations.

Findings

Experimental results demonstrated that compensating the joint torques using both pre-calibrated gravity and friction resistance has performance comparable to a force sensor installed on the end effector of a manipulator. It is possible to implement satisfying direct teaching without using force sensors on 7 degree of freedom manipulators with large mass and friction resistance.

Originality/value

The main contribution of the paper is that the authors cancel out both pre-calibrated gravity and friction resistance to improve the direct teaching using only current sensors; they develop methods to avoid unsafe situations like slow drifts. The method will benefit industrial manipulators, especially those with large mass and friction resistance, to realize flexible and reliable direct teaching.

Details

Assembly Automation, vol. 38 no. 2
Type: Research Article
ISSN: 0144-5154

Keywords

Article
Publication date: 3 February 2022

Juan Du, Yan Xue, Vijayan Sugumaran, Min Hu and Peng Dong

For prefabricated building construction, improper handling of the production scheduling for prefabricated components is one of the main reasons that affect project performance…

Abstract

Purpose

For prefabricated building construction, improper handling of the production scheduling for prefabricated components is one of the main reasons that affect project performance, which causes overspending, schedule overdue and quality issues. Prior research on prefabricated components production schedule has shown that optimizing the flow shop scheduling problem (FSSP) is the basis for solving this issue. However, some key resources and the behavior of the participants in the context of actual prefabricated components production are not considered comprehensively.

Design/methodology/approach

This paper characterizes the production scheduling of the prefabricated components problem into a permutation flow shop scheduling problem (PFSSP) with multi-optimization objectives, and limitation on mold and buffers size. The lean construction principles of value-based management (VBM) and just-in-time (JIT) are incorporated into the production process of precast components. Furthermore, this paper applies biogeography-based optimization (BBO) to the production scheduling problem of prefabricated components combined with some improvement measures.

Findings

This paper focuses on two specific scenarios: production planning and production rescheduling. In the production planning stage, based on the production factor, this study establishes a multi-constrained and multi-objective prefabricated component production scheduling mathematical model and uses the improved BBO for prefabricated component production scheduling. In the production rescheduling stage, the proposed model allows real-time production plan adjustments based on uncertain events. An actual case has been used to verify the effectiveness of the proposed model and the improved BBO.

Research limitations/implications

With respect to limitations, only linear weighted transformations are used for objective optimization. In regards to research implications, this paper considers the production of prefabricated components in an environment where all parties in the supply chain of prefabricated components participate to solve the production scheduling problem. In addition, this paper creatively applies the improved BBO to the production scheduling problem of prefabricated components. Compared to other algorithms, the results show that the improved BBO show optimized result.

Practical implications

The proposed approach helps prefabricated component manufacturers consider complex requirements which could be used to formulate a more scientific and reasonable production plan. The proposed plan could ensure the construction project schedule and balance the reasonable requirements of all parties. In addition, improving the ability of prefabricated component production enterprises to deal with uncertain events. According to actual production conditions (such as the occupation of mold resources and storage resources of completed components), prefabricated component manufacturers could adjust production plans to reduce the cost and improve the efficiency of the whole prefabricated construction project.

Originality/value

The value of this article is to provide details of the procedures and resource constraints from the perspective of the precast components supply chain, which is closer to the actual production process of prefabricated components. In addition, developing the production scheduling for lean production will be in line with the concept of sustainable development. The proposed lean production scheduling could establish relationships between prefabricated component factory manufacturers, transportation companies, on-site contractors and production workers to reduce the adverse effects of emergencies on the prefabricated component production process, and promote the smooth and efficient operation of construction projects.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 4
Type: Research Article
ISSN: 0969-9988